Excessive Excavation
How to remove over 64 000 cubic meter of material from TableTop Mountain in 2 month ?
Easy, with 2 Excavators, a Stone Crusher and thousands of dump truck loads …
That generates dust, noise, vibration, pollute our air with diesel exhaust and will contribute to soil erosion.
That is excessive and NOT appropriate for an Environment Sensitive Area and within the municipality of Peachland … IT IS unjustifiable destruction !!
This entry was posted on Tuesday, May 12th, 2009 at 19:10 and is filed under Work. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.
Leave a Reply
You must be logged in to post a comment.
