Is TM doing an excessive excavation ?? Judge for yourself.
Between the existing grade and proposed grade, 6 to 9 meter will be removed !!
The TableTop area is approx. 10000 square meter.
They removed 64000 cubic meter !!! (See May 12th Post)
(more with the add. excavation for the road and rest of homes)
It is equal the size of a Football Field covered with dirt 30 feet high !!
Hundreds of hours of heavy machines work and hundreds of trips by large trucks to bring the material to the front and back. That generates dust, noise, vibration, pollute our air with diesel exhaust and will contribute to soil erosion.
That is excessive and NOT appropriate for an Environment Sensitive Area and within the municipality of Peachland!!
The above photo is an old calculation – see Post May 12th for the new data …
After I saw the pictures I must say it´s really a shame! It´s important that everyone rethinks his behavior regarding the nature. We must save the environment for our children and our children’s children. Stop this destructive exploitation!